Combined Linen Services

Location: | Torquay, Devon |
---|---|
Commencement: | December 2001 |
Length of contract: | 16-20 weeks |
Project type: | Laundry |
The overall project was managed by Adrian Clay who worked closely with Kannegiesser (machinery manufacturer) from the building design phase to ensure the installation went smoothly, there was a mix of new & used equipment installed with Clay & Abbott being responsible for the design of the services & utility delivery systems and the overall equipment installation.
This project required special attention from our design team as the location of the installation was in a valley required the installation of a self supporting chimney.